
We do that with our end-to-end offer
Poveda de la Obispalía, Spain
39°57`N 2°26´W
Operating since
2024
Hybridization

Headquarters
Anatole France, 10, Polanco Chapultepec, México DF, CP 11560 (México)
19°26`N 99°12´W
Emails
Phones
At the San Miguel de Allende photovoltaic solar plant, we will have the capacity to generate 35 MW
Located on an 85-hectare site at Rancho Guadalupe, Guanajuato, the construction phase spans twelve months, with an expected useful life of around 30 years. Our goal with this project is to generate electricity from a green, infinite, and silent energy source, the sun, captured through photovoltaic panels (conversion efficiency of 20.55%) and injected into the electrical grid.