• Year
    2007

    Grenergy is born.
    The company is founded by 5 people.
  • Year
    2008

    Cuenca. 3 MW.
    We combine different technologies in a single plant: thin film and polychrystalline technology.
  • Year
    2009

    Toledo. 1 MW.
    First project undertaken with a seasonal mobile structure. Production was increased by 8%.
  • Year
    2010

    Sevilla. 1,2 MW.
    The first installation monitored by GrenpvRedictor.
  • Year
    2011

    Ávila. 2,1 MW.
    We combine a set structure with a seasonal mobile structure.
  • Year
    2012

    Granada. 4,1 MW.
    A great leap in energy innovation by building a sustainable greenhouse with a photovoltaic roof.
  • Year
    2013

    Córdoba and Granada. 2 MW.
    Installing solar-panel roofs on industrial warehouses.
  • Year
    2014

    Coquimbo, Chile. 3 MW.
    We complete the development of our first project outside Spain.
  • Year
    2015

    Chile.
    We connect the first solar PMGD to the “Stable Price” programme in Chile.
  • Year
    2016

    Chile and Peru.
    Several plants built in Chile and awarded two wind farms in Peru.
  • Year
    2017

    Chile and Patagonia.
    Largest number of PMGD plants operating in Chile and procurement of 24 MW wind farms in Patagonia.
  • Year
    2018

    +254%
    We are the listed company that most increased its value on the Stock Market in 2018.
  • Year
    2019

    We made the financial close and started construction of two wind farms in Peru and Argentina.
  • Year
    2020

    Quillagua, Chile 103MW
    Commissioning of our largest plant to date.
2007
2007
2008
2009
2010
2011
2012
2013
2014
2015
2016
2017
2018
2019
2020
2020

Lines of Business

We produce energy independently through the development, financial structuring, building, operation and maintenance of large-scale renewable energy plants. Being as efficient as possible requires us to be a player that is fully integrated across the entire process.

EBITDA
Total by years

M€

D&C

This includes searching for projects that are both financially and technically feasible, achieving the milestones required to start construction, and the site work to build and start running the project.

D&C
EBITDA Margin
Referred to FY21

ENERGY

This is the income resulting from the sale of energy in each market where GRENERGY has its own plants as an Independent Power Producer (IPP).

ENERGY
EBITDA Margin
Referred to FY21

SERVICES

Services rendered to projects once the Commercial Operation Date (COD) is reached. It comprises Asset Management and Operation & Maintenance, provided to our own projects as IPP and to third-party projects. For the period 2016-2020, Grenergy maintains a level of 100% of client retention.

SERVICES
EBITDA Margin
Referred to FY21
  • BloombergNEF

    "Wind and solar make up almost 50% of world electricity in 2050 and help put the power sector on track for 2 degrees at least 2030"
  • World Economic Outlook

    "A cost-effective combination of cheaper battery storage and solar PV could reshape the evolution of the power mix in the coming decades." 2019 report
  • BloombergNEF

    "Wind and solar are now cheapest across more than two-thirds of the world. By 2030 they undercut commissioned coal and gas almost everywhere"
  • Goldman Sachs

    “The new economy will either be green and sustainable or it won´t be"
  • UBS

    “ "Rising climate pressure makes wind & solar the new core business” January 2019

Technological evolution in the sector

Technological advances bring us closer to the era of alternative energies.

Renewable

Renewable

Fossil fuels

Fossil fuels

Fossils fuels and renewable energies

SCROLL

Evolution in the cost of wind power

SCROLL
*Source: Lazard’s Levelized Cost of Storage Analysis Version 4.0, November 2018

Evolution in the cost of solar power

SCROLL
*Source: Lazard’s Levelized Cost of Storage Analysis Version 4.0, November 2018

Evolution in the cost of Vanadium batteries

SCROLL
*Source: Lazard’s Levelized Cost of Storage Analysis Version 4.0, November 2018

Evolution in the cost of Lithium batteries

SCROLL
*Source: Lazard’s Levelized Cost of Storage Analysis Version 4.0, November 2018
Grupal_Consejeros_web
Grupal_Consejeros_web

Management Committee

Governing bodies
Spain
Spain

Spain

Rafael Botí, 26
CP 28023
Madrid (España)

+(34) 91 708 19 70
info@grenergy.eu

Geographical presence

10 países y abriendo nuevos mercados
Spain
Spain
Mexico
Mexico

Mexico

Anatole France, 10
Polanco Chapultepec
México DF, CP 11560 (México)

+(52) 55 6723 7027
+(52) 55 5280 1293
mexico@grenergy.eu

Geographical presence

10 países y abriendo nuevos mercados
Mexico
Mexico
Chile
Chile

Chile

Isidora Goyenechea 2800, oficina 3702, Las Condes
Torre Titanium
Santiago de Chile (Chile)

+(56) 23251 9400
chile@grenergy.eu

Geographical presence

10 países y abriendo nuevos mercados
Chile
Chile
Peru
Peru

Peru

Avenida Juan de Arona N° 755 Piso 10
Edificio We Work
San Isidro, Lima (Perú)

+(51) 957 342 482
peru@grenergy.eu

Geographical presence

10 países y abriendo nuevos mercados
Peru
Peru
Colombia
Colombia

Colombia

Calle 93 B 19 – 35/57 ofc 302/201
Oficina 401, Edificio Varesse
Bogotá (Colombia)

+(57) 300-7081831
colombia@grenergy.eu

Geographical presence

10 países y abriendo nuevos mercados
Colombia
Colombia
Argentina
Argentina

Argentina

Esmeralda 950
Piso 16, oficina 116
Capital Federal, Buenos Aires (Argentina)

+54 11 53657263
argentina@grenergy.eu

Geographical presence

10 países y abriendo nuevos mercados
Argentina
Argentina
UK
UK

UK

20 Fitzroy Square
London, United Kingdom
W1T 6EJ

44 (0) 7544 055612
uk@grenergy.eu

Geographical presence

10 países y abriendo nuevos mercados
UK
UK
Italia
Italia

Italia

via Borgonuovo 9
20121 Milano
Italia

+39 366 978 0112
italy@grenergy.eu

Geographical presence

10 países y abriendo nuevos mercados
Italia
Italia
EEUU
EEUU

EEUU

Birmingham
Alabama 35209
Estados Unidos

Geographical presence

10 países y abriendo nuevos mercados
EEUU
EEUU
Polonia
Polonia

Polonia

Geographical presence

10 países y abriendo nuevos mercados
Polonia
Polonia