Pipeline

At GRENERGY we never stop studying new development opportunities,
which are the seed of future projects. We have before us a growth
without limits..

Pipeline stages

Different projects in development, ready to build or at different stages of maturity.

<50%
odds

Early Stage

A project that is technically and financially feasible, given that:
  • the possibility of land exists,
  • access to the electricity grid is operationally feasible, and/or
  • the possibility of selling to third parties also exists.

>50%
odds

Advanced Development

Project at an advanced technical and financial stage, given that:
  • the land is guaranteed or we consider there is more than a 50% chance of obtaining it,
  • the relevant requests to access the electricity grid have been placed and the probability of the request being approved is estimated to be more than 90%, and
  • environmental permits have been requested.

>80%
odds

Backlog

Project in its final stages prior to construction, where:
  • the land and access to the electricity grid are guaranteed,
  • the probability of the environmental permit being approved is more than 90%, and
  • there is a PPA in place; or a framework contract with an off taker or bank ready to be signed; or a bankable price stabilization scheme.

100%
odds

Under Construction

The EPC constructor has been given the order to start building

100%
odds

IPP Operation

Project acceptance has been signed. Responsibility for the asset has been transferred from the constructor to the operations team.
  • Early Stage

    pipeline-hover

    <50%
    odds

    A project that is technically and financially feasible, given that:
    • the possibility of land exists,
    • access to the electricity grid is operationally feasible, and/or
    • the possibility of selling to third parties also exists.
  • Advanced Development

    pipeline-hover

    >50%
    odds

    Project at an advanced technical and financial stage, given that:
    • the land is guaranteed or we consider there is more than a 50% chance of obtaining it,
    • the relevant requests to access the electricity grid have been placed and the probability of the request being approved is estimated to be more than 90%, and
    • environmental permits have been requested.
  • Backlog

    pipeline-hover

    >80%
    odds

    Project in its final stages prior to construction, where:
    • the land and access to the electricity grid are guaranteed,
    • the probability of the environmental permit being approved is more than 90%, and
    • there is a PPA in place; or a framework contract with an off taker or bank ready to be signed; or a bankable price stabilization scheme.
  • Under Construction

    pipeline-hover

    100%
    odds

    The EPC constructor has been given the order to start building
  • IPP Operation

    pipeline-hover

    100%
    odds

    Project acceptance has been signed. Responsibility for the asset has been transferred from the constructor to the operations team.
SOLAR PIPELINE
We have a large portfolio of photovoltaic projects.

*(More than 25 farms connected by Grenergy)

SCROLL
Early stage
MW's
Advanced development
MW's
Backlog
MW's
Under construction
MW's
Total
MW's
Chile 650 1202 200 173 2225
España - 747 500 - 1247
Colombia 636 144 72 72 924
Perú - 230 - - 230
UK 391 95 - - 486
Italy 260 - - - 260
Total 1937 2418 772 245 5372
Nº PROJECTS 48 34 19 23 124

Projects by stages

Projects by country

WIND PIPELINE
We have successfully developed several wind projects.

*(More than 60 MW in construction or connected)

SCROLL
Early stage
MW's
Advanced development
MW's
Backlog
MW's
Under construction
MW's
Total
MW's
Chile 350 100 - - 450
Perú 360 112 - - 472
Total 710 212 - - 922
Nº PROJECTS 2 6 - - 8

Projects by stages

Projects by country

Escuderos
Escuderos

Solar plantEscuderos

Spain

Annual production

390 GWh

Installed power

200 MW

Annual avoided emissions

144.690 TCO2e

Quillagua
Quillagua

Solar plantQuillagua

Chile

Annual production

305 GWh

Installed power

103 MW

Annual avoided emissions

113.155 TCO2e

San Miguel de Allende
San Miguel de Allende

Solar plantSan Miguel de Allende

Mexico

Annual production

86 GWh

Installed capacity

35 MW

Annual emissions avoided

16.000 TCO2e

Duna Huambos
Duna Huambos

Eolico ParkDuna Huambos

Peru

Annual production

168 GWh

Installed power

36 MW

Annual avoided emissions

62.328 TCO2e

Kosten
Kosten

Eolico ParkKosten

Argentina

Annual production

120.8 GWh

Installed power

24 MW

Annual avoided emissions

44.816 TCO2e